A coordinated approach
Coordinate window dimensions, proposed shade locations, pockets, and cable routes with the architect, builder, and shade plan. Final hardware requirements should guide preparation.
From planning to handover
We coordinate the agreed scope with the project team, document the important decisions, and bring the system through installation, programming, and homeowner orientation. Share the current drawings and schedule so we can discuss the next useful step.
Use the window schedule as the starting point
Assign each shade location a room and opening identifier. Coordinate the proposed hardware, mounting position, power approach, and any concealed pocket with the shade provider and relevant trades. Approximate window sizes are useful for planning, but final ordering requires the installer’s measurement process. Do not assume identical preparation for every opening or shade type.
Protect access through the finishing stage
Confirm how the installer will reach the power connection and mounting points after trim and ceiling work are complete. Review pocket details before construction closes them. Keep cable labels aligned with the window schedule and record changes to openings or finishes. At completion, check individual and grouped operation against the room plan and demonstrate the controls to the owner.